/ IATF 16949 coverage

IATF 16949 change control for plants without the audit-week scramble

Approval, deployment and audit of every PLC, SCADA and HMI change — aligned to IATF 16949 from day one, generated as a by-product of the work, not assembled the week before the audit.

/ 01Scope

What counts as an OT change

/ Change type

PLC code

Logic edits, routine changes, function-block swaps, firmware updates.

/ Change type

SCADA tags

Point database additions, alarm threshold edits, scaling changes.

/ Change type

HMI graphics

Screen layout, button bindings, operator permission scopes.

/ Change type

Recipes

Production recipes, setpoints, batch parameters, ingredient lists.

/ Change type

Machine parameters

Drive parameters, IO config, safety thresholds, network topology.

/ 02IATF 16949

How VEM aligns to IATF 16949

IATF 16949 section 8.5.6 requires the organisation to control and document changes to production processes — including the PLC code, HMI configuration and machine parameters that define the process — and to validate that the change does not adversely affect product conformity. VEM ties every controller change to the PPAP-approved baseline, captures the approver and the diff, and produces the trace evidence required by both the certification body and the customer-specific requirements layered on top. See the broader the complete OT change management guide for the cross-regime crosswalk.

/ Use case

A Tier-1 automotive supplier producing brake assemblies for three OEMs uses VEM to maintain the change record against each customer's PPAP baseline. When an OEM quality auditor requested traceability for a parameter change on a torque station, the supplier produced the full chain — change request, customer notification, approval, deployed diff, post-deploy verification — in two minutes.

/ 03Process

Request → Review → Deploy → Audit

/ 01

Request

Engineer files a change with the proposed diff attached.

/ 02

Review

CAB or single approver reviews the diff, risk and deployment plan.

/ 03

Deploy

VEM pushes the approved version, captures before/after signatures.

/ 04

Audit

Immutable record links request, approval, diff and deployment.

/ 04Compliance

Other regimes covered

Want the full framework? the complete OT change management guide.

/ 05FAQ

IATF 16949 change management — common questions

Make IATF 16949 change evidence a by-product, not a project.

Book a demo →