Meet VEM. Configuration in control.

The Version Equipment Manager — built specifically for continuously validated production. A continuously validated system, without the validation drag.

>70%
reduction in test execution time
/ FAT → SAT
3.7×
lower per-line cost at fleet scale
/ Fleet programme
~10 min
full line verification
/ In-field engagement
↓ SCROLLSIGNAL 001 — IN CONTROL

/ THE REALITY

Configuration management shouldn't feel like chasing ghosts across every line.

/ 02Architecture

One platform. Every component in scope.

VEM sits at the centre of the asset — skid, line or site — holding a single configuration baseline across PLC, SCADA, vision, databases and machine parameters.

Control layer
PLC · Motion controllers (Siemens · Rockwell · Schneider · Beckhoff · Elau)
Visualization
SCADA / HMI systems · FactoryTalk · Zenon · Java HMI
Inspection
Vision systems (Cognex · Omron) · Laser & label printers (Domino · Zebra)
Data
SQL Server · Access · Machine parameter files
Don't see your component?
We extend coverage on request — talk to the team and we'll develop support for your stack.
SCADA / HMI
Databases (SQL)
Vision systems
Machine parameters
Laser & label printers
PLC controllers
Motion controllers
Robotics (ABB · KUKA)
/ 01 — Mechanism

Three pillars. One source of truth.

Every layer in the stack sits on the one below it. Pull any layer out and the rest stops meaning what it used to.

01
Baseline & Compare.

Capture an immutable configuration baseline at every phase boundary. Compare across versions to prove what changed — and what didn't.

02
Monitor & Detect.

Continuous change monitoring across every in-scope system. Every drift is captured, attributed and surfaced where decisions get made.

03
Version History.

Every in-control version is held and time-ordered. A complete, searchable record of what changed, when and by whom.

/ 02 — Proof

Measured outcomes. Not marketing claims.

>70%
reduction in test execution time
/ Reference packaging line, FAT → SAT
weeks → 1 day
from full validation to single-day verification
/ In-field engagement
~1 week
from kick-off to first validated baseline
/ Standard implementation
3.7×
lower per-line cost at fleet scale
/ Capacity-expansion programme
/ 03 — Audience

Who VEM is for.

/ Project Managers

Milestone velocity

Faster milestones. Fewer surprises late in the project.

/ QA Teams

Audit-ready trust

Automated documentation and traceability — audit-ready by default.

/ Engineering

Seamless handovers

Early defect detection, cleaner hand-overs, less rework.

/ Vendors

Objective readiness

Clear, objective readiness criteria before every FAT.

/ 03Index

Explore VEM.

/ Manifesto
Configuration is the quiet half of every system. VEM is what makes it loud enough to trust.
— VEMED. 01 / 2026